Plan succession. Find the right people and prepare them.
Who takes over when someone leaves your organisation? Lianova connects planned exits with concrete succession requirements. Compare possible successors, spot development needs, and plan preparation in the time that remains.
PaulResponsibility for people developmentExit in nine months
TodayPlanned exit
Possible succession
Mara
Nora
Succession example
From exit to prepared handover
Fictional example · Simplified view
01
01 · Exit in view
Paul leaves in nine months. Who takes his role?
Paul is responsible for people development. His exit is set; succession is still open. In Lianova you see which role must be filled and how much time remains for preparation. That lets you look at possible successors early and align their development with the planned transition.
Responsibility for people development
Current holderPaul
Exit in nine monthsSuccession open
TodayExit in nine monthsPlanned exit
02
02 · Define requirements
Which capabilities does the future holder need?
Define which tasks the successor should take on and which capabilities are required at which level. The previous holder’s captured profile can serve as a basis. For Paul’s succession, the example looks at four requirements: clarify development needs, advise leaders, develop training concepts, and develop competency models further.
PaulResponsibility for people development
Clarify development needs
Advise leaders
Develop training concepts
Develop competency models further
Paul’s captured profile can serve as a basis — not every trait becomes a binding requirement automatically.
03
03 · Review the succession pool
Who could take over?
Lianova matches possible successors with the defined requirements. In the pool you see which capabilities are already covered and where development is still needed. In the example, Mara reaches the target level for advising leaders. Nora brings the required strength in developing training concepts. The comparison makes their different starting points visible.
Responsibility for people development
Requirement
Mara
Nora
Clarify development needs
Target level reached
Target level reached
Advise leaders
Target level reached
Develop further
Develop training concepts
Develop further
Target level reached
Develop competency models further
Develop further
Develop further
TodayExit in nine monthsPlanned exit
04
04 · Prepare succession
What must Mara develop before the planned handover?
In the example, Mara is prepared for succession. For training concepts and developing competency models further, her captured level is still below the defined targets. From these skill gaps and the nine months until Paul’s exit, a development plan can be built. It links open requirements with concrete measures, practical tasks, and checkpoints to review progress.
MaraSelected for preparation
Exit in nine months
Illustrative development plan
Open requirement → planned step → review
Months 1–3Select a fitting learning offer and develop a training concept from a concrete need
Develop training concepts
Months 4–6Revise a limited part of the competency model and have it reviewed
Develop competency models further
Months 7–9Work on tasks independently and compare progress with both target levels
Develop training concepts
Develop competency models further
Develop training concepts
Develop competency models further
05
05 · Prepare the handover
What is still open until the exit?
Look at fit to the requirements and the assessment of a possible handover together. That keeps clear which prerequisites are already met and which preparation is still needed. In the example, Mara is selected for preparation. Her development plan is in place; two skill goals stay open for now. At the planned checkpoints you can judge whether preparation is enough or further steps are needed.
Current holder
Paul
Planned exitExit in nine months
Selected for preparation
Mara
Target level reached
Clarify development needs
Advise leaders
Develop further
Develop training concepts
Develop competency models further
Development plan: planned
TodayExit in nine monthsPlanned exit
Who takes your next key role that becomes free?
Discover how Lianova helps you compare possible successors and plan their preparation until the intended handover.